For standpipes: if shutoff valves have been installed between connection flanges and boiler nozzles. A drain valve is also required
For nozzels: if boiler nozzle corresponds to the construction according to data sheet D-08-D-16351-0.
Protection tube K, flanges, screws, nuts and sealings can be delivered too.
For probe installation see data sheet D-08-D-16352-0