- The most economical solution for underground applications.
- Easy to install on most brands of 200 A or 600 A class elbows with capacitive test points.
- Automatic reset upon restoration of system voltage.
- Ideal for pad-mounted transformer and switchgear applications.
- Several remote display options eliminate the need to open an enclosure cabinet to determine the indicator's status.
- Available in single- and three-phase models.
- Simply remove the fault indicator to access the test point.
- Auxiliary contact option for SCADA compatibility.
- Junction shield option prevents false tripping due to adjacent phase effects. Please consult SEL.