- Quality control of the insulators during installation or underground network repair
- Follow-up of the ageing process of the critical components' insulation
- Safety control prior to work conducted under charge
- Verification of the joints under normal charge of the electric network
- Use of the surface sensor, which does not require direct access to the cable's voltage
- Progressive analysis of the database
- Keeps the readings in memory, with the date and the hour
- Transfers the collected data stored in a computer to ensure the follow-up of -the measurements
- Communicates the results to an expert via a computer connected to the Internet
- Water-proof and rugged for work site applications
|